Surfacing · June 2020
Junction resurfacing, East Sussex
Trenchline carried out a project to resurface a section of road at a junction, along with laying a new kerb line.
A selection of surfacing and traffic management work across East Sussex.
Surfacing · June 2020
Trenchline carried out a project to resurface a section of road at a junction, along with laying a new kerb line.
Surfacing · June 2020
Two footway reconstruction projects with East Sussex Highways at Ashford Road, Hastings and Pinewoods, Bexhill. Replacing the old paving slabs with fresh asphalt improves the look of the footways and makes them safer for pedestrians.
Surfacing · June 2020
Carriageway patch and drainage finished off at The Triangle in Willingdon. The tarmac has been purposely dipped in front of the newly installed kerb weir gullies, so surface water can flow freely into them.
Traffic management · June 2020
Tony Card and Carl Dangerfield completed their M1, M2 and M5 training. Those qualifications allow them to set up multiphase signals on the highway, including this 3-way traffic management system in Newhaven.
Surfacing · May 2023
Carriageway patching works completed for East Sussex Highways. The teams worked to maintain and improve the condition of the local roads.
Surfacing · May 2023
A footway scheme for East Sussex Highways using footway slurry, to give the local community a safe and durable pedestrian route. The photograph shows the works at Framfield Road, Blackboys.