Projects

A selection of surfacing and traffic management work across East Sussex.

Resurfaced junction in East Sussex

Surfacing · June 2020

Junction resurfacing, East Sussex

Trenchline carried out a project to resurface a section of road at a junction, along with laying a new kerb line.

Footway reconstruction project

Surfacing · June 2020

Ashford Road and Pinewoods

Two footway reconstruction projects with East Sussex Highways at Ashford Road, Hastings and Pinewoods, Bexhill. Replacing the old paving slabs with fresh asphalt improves the look of the footways and makes them safer for pedestrians.

Carriageway patch and drainage at The Triangle in Willingdon

Surfacing · June 2020

The Triangle, Willingdon

Carriageway patch and drainage finished off at The Triangle in Willingdon. The tarmac has been purposely dipped in front of the newly installed kerb weir gullies, so surface water can flow freely into them.

3-way traffic management system in Newhaven

Traffic management · June 2020

Newhaven

Tony Card and Carl Dangerfield completed their M1, M2 and M5 training. Those qualifications allow them to set up multiphase signals on the highway, including this 3-way traffic management system in Newhaven.

Carriageway patching for East Sussex Highways

Surfacing · May 2023

Carriageway patching scheme

Carriageway patching works completed for East Sussex Highways. The teams worked to maintain and improve the condition of the local roads.

Footway slurry scheme at Framfield Road, Blackboys

Surfacing · May 2023

Footway scheme, slurry

A footway scheme for East Sussex Highways using footway slurry, to give the local community a safe and durable pedestrian route. The photograph shows the works at Framfield Road, Blackboys.